Brochure Request

Overview

  • Live Instructor-Led Classes
  • CCNP Training on Weekdays, Weekends and Evenings
  • 3 Exams, Real Time Simulation, Single and Multiple Choice Questions
  • CCNP classroom training.
  • Hands-on Training, Lab Exercises, Project work, Unlimited Lab Access, Free Re-training
  • Cisco CCNP Certification

CCNP Training Overview:

Certification:

  • Cisco CCNP Certification


Delivery:

  • CCNP classroom training. Instructor led hands-on classes.


CCNP Certification Exams:

  • 3 Exams, Real Time Simulation, Single and Multiple Choice Questions
  • CCNP Certification Course


CCNP Course Length:

  • 12 Weeks or Fast Track 12 Days


CCNP Training Includes:

  • Hands-on Training, Lab Exercises, Project work, Unlimited Lab Access, Free Re-training


CCNP Training Locations:

  • Liverpool Street, London
  • London Bridge, London
  • Moorgate, London


Flexible Starting Dates:

  • CCNP Training on Weekdays, Weekends and Evenings


Price Info

  • Hands-on Tutor Led Training
  • Classroom Based Practical Training
  • Unlimited Practice Lab Access
  • Small Size Class and Interactive Sessions
  • Lab Exercises
  • Mock Exam
  • WiFi Internet
  • Refreshments
  • Completion Certificate
  • Free Re-training
  • Cost is calculated at 70 percent Tuition Vatable and 30 percent Training Book(s) with 0 rated Vat


Package Offer: Great Savings!!!

Professional Package


MCSE Windows Server 2012 - £1750 + CCNA Certification - £850 : Total Price £2600


Career Package


MCSE Windows Server 2012 - £1750 + CompTIA A+ Certification - £890 + CCNA Certification - £850 : Total Price £3490


Specialised Package


CCNA Certification - £850 + CCNP Certification - £3500 : Total Price £4350


Detailed Syllabus


CCNP EXAM 300-101 ROUTE - Implementing Cisco IP Routing(ROUTE)

EIGRP based solution, network design and a set of requirements

  • Network resources needed for implementing EIGRP on a network
  • Create an EIGRP implementation plan, EIGRP verification plan
  • Configure EIGRP routing
  • Verify EIGRP solution was implemented, Use show and debug commands
  • Document results of EIGRP implementation and verification


Multi-area OSPF Network, given a network design and a set of requirements

  • Determine network resources needed for implementing OSPF on a network
  • Create an OSPF implementation plan, OSPF verification plan
  • Configure OSPF routing
  • Verify OSPF solution was implemented properly using show and debug commands
  • Document results of OSPF implementation and verification plan


eBGP based solution, given a network design and a set of requirements

  • Determine network resources needed for implementing eBGP on a network
  • Create an eBGP implementation plan
  • Create an eBGP verification plan
  • Configure eBGP routing
  • Verify eBGP solution was implemented properly using show and debug commands
  • Document results of eBGP implementation and verification plan


IPv6 based solution, given a network design and a set of requirements

  • Determine network resources needed for implementing IPv6 on a network
  • Create an IPv6 implementation plan, IPv6 verification plan
  • Configure IPv6 routing
  • Configure IPv6 interoperation with IPv4
  • Verify IPv6 solution was implemented properly using show and debug commands
  • Document results of IPv6 implementation and verification plan


IPv4 or IPv6 based redistribution solution, given a network design and a set of requirements

  • Create a redistribution implementation plan based upon the results of the redistribution analysis
  • Create a redistribution verification plan
  • Configure a redistribution solution
  • Verify that redistribution was implemented
  • Document results of a redistribution implementation and verification plan
  • Identify the differences between implementing an IPv4 and IPv6 redistribution solution


Layer 3 Path Control Solution

  • Create a Layer 3 path control implementation plan based upon the results of the redistribution analysis
  • Create a Layer 3 path control verification plan
  • Configure Layer 3 path control
  • Verify that a Layer 3 path control was implemented
  • Document results of a Layer 3 path control implementation and verification plan
  • Implement basic teleworker and branch services
  • Describe broadband technologies
  • Configure basic broadband connections
  • Describe basic VPN technologies
  • Configure GRE
  • Describe branch access technologies


CCNP EXAM 300-115 SWITCH - Implementing Cisco IP Switched Networks (SWITCH)

Implement VLAN based solution, given a network design and a set of requirements

  • Determine network resources needed for implementing a VLAN based solution on a network
  • Create a VLAN based implementation plan
  • Create a VLAN based verification plan
  • Configure switch-to-switch connectivity for the VLAN based solution
  • Configure loop prevention for the VLAN based solution
  • Configure Access Ports for the VLAN based solution
  • verify the VLAN based solution was implemented properly using show and debug commands
  • Document results of VLAN implementation and verification


Implement a Security Extension of a Layer 2 solution, given a network design and a set of requirements

  • Determine network resources needed for implementing a Security solution
  • Create a implementation plan for the Security solution
  • Create a verification plan for the Security solution
  • Configure port security features
  • Configure general switch security features
  • Configure private VLANs Configure VACL and PACL
  • Verify the Security based solution was implemented properly using show and debug commands
  • Document results of Security implementation and verification


Implement Switch based Layer 3 services, given a network design and a set of requirements

  • Determine network resources needed for implementing a Switch based Layer 3 solution
  • Create an implementation plan for the Switch based Layer 3 solution
  • Create a verification plan for the Switch based Layer 3 solution
  • Configure routing interfaces Configure Layer 3 Security
  • Verify the Switch based Layer 3 solution was implemented properly using show and debug commands
  • Document results of Switch based Layer 3 implementation and verification


Prepare infrastructure to support advanced services

  • Implement a Wireless Extension of a Layer 2 solution
  • Implement a VoIP support solution
  • Implement video support solution


Implement High Availability, given a network design and a set of requirements

  • Determine network resources needed for implementing High Availability on a network
  • Create a High Availability implementation plan
  • Create a High Availability verification plan
  • Implement first hop redundancy protocols
  • Implement switch supervisor redundancy
  • Verify High Availability solution was implemented properly using show and debug commands
  • Document results of High Availability implementation and verification


CCNP EXAM 300-135 TSHOOT - Troubleshooting and Maintaining Cisco IP Networks (TSHOOT)

Maintain and monitor network performance

  • Develop a plan to monitor and manage a network
  • Perform network monitoring using IOS tools
  • Perform routine IOS device maintenance
  • Isolate sub-optimal internetwork operation at the correctly defined OSI Model layer


Troubleshoot Multi Protocol system networks

  • Troubleshoot EIGRP
  • Troubleshoot OSPF
  • Troubleshoot eBGP
  • Troubleshoot routing redistribution solution
  • Troubleshoot a DHCP client and server solution
  • Troubleshoot NAT
  • Troubleshoot first hop redundancy protocols
  • Troubleshoot IPv6 routing
  • Troubleshoot IPv6 and IPv4 interoperability
  • Troubleshoot switch-to-switch connectivity for the VLAN based solution
  • Troubleshoot loop prevention for the VLAN based solution
  • Troubleshoot Access Ports for the VLAN based solution
  • Troubleshoot private VLANS
  • Troubleshoot port security
  • Troubleshoot general switch security
  • Troubleshoot VACL and PACL
  • Troubleshoot switch virtual interfaces (SVIs)
  • Troubleshoot switch supervisor redundancy
  • Troubleshoot switch support of advanced services (i.e., Wireless, VOIP and Video)
  • Troubleshoot a VoIP support solution
  • Troubleshoot a video support solution
  • Troubleshoot Layer 3 Security
  • Troubleshoot issues related to ACLs used to secure access to Cisco routers
  • Troubleshoot configuration issues related to accessing the AAA server for authentication purposes
  • Troubleshoot security issues related to IOS services (i.e., finger, NTP, HTTP, FTP, RCP etc.)